Thus cost-effectiveness begins already with production. Without patented rebar welding machine, unique in Germany, we reduce manufacturing costs already in this stage through optimal use of materials. The large-sized wall and ceiling elements mean that with an experienced construction team the cellar is assembled accurately within a day!

Production & Assembly

8:05 a.m. Beginning of the construction day
10:45 a.m. Assembly of the last wall element
11:00 a.m. Laying the first ceiling element
12.15 p.m. Assembly of the staircase element
12:45 p.m. Conclusion of assembly work
16.00 p.m. Final concreting of the wall and ceiling elements
Optimised use of materials
Patented rebar welding system welding
Computer-controlled formwork robot
Concreting accurate to the millimetre
Inspected element quality